|
Canada-0-MATTRESSES 公司名錄
|
公司新聞:
- RC West Coordination Plan
RC West monitors and acts to prevent the likelihood of a SOL or IROL exceedance in its own area or other areas of the Interconnection, and coordinates with impacted Reliability Coordinators when there is a difference in limits
- RC West has revised operating procedures RC0100, RC0120, RC0120A . . .
Updated version numbers for NERC Standards IRO-010 and PRC-002 Minor formatting and grammar punctuation edits and removed history prior to five years RC0120A RC West IRO-010 Data Specification, version 6 6, effective July 1, 2025
- Standard IRO-010-1a — Reliability Coordinator Data Specification and . . .
Question 1 Does the phrase, “as specified” in Requirement R3 reference the documented data and information specification in IRO-010-1 Requirement R1, or is the data and information in Requirement R3 “any” data and information that the Reliability Coordinator might request?
- IRO-010-5 - North American Electric Reliability Corporation
Effective Date: See Implementation Plan for Project 2021-06 R1 The Reliability Coordinator shall maintain documented specification(s) for the data and information necessary for it to perform its Operational Planning Analyses, Real-time monitoring, and Real-time Assessments
- RDS Guideline - spp. org
This report lists the critical PMU signals to monitor, as determined by the SPP West RC Only these critical PMUs have a required availability performance criteria
- Compliance Bulletin IRO-010 and TOP-003 - ISO New England
2 1 NERC Standards IRO-010 R1 (for TOP-003 R1 R2, see Standard) R1 The Reliability Coordinator (Each Transmission Operator Balancing Authority) shall maintain documented specification(s) for the data and information necessary for it to perform its Operational Planning Analyses, Real-time monitoring, and Real-time Assessments
- NERC Compliance Submission or Request Guide - spp. org
Updated NERC Standard version for IRO-010 and TOP-003 Updated submittal method for IRO-010 and TOP-003
- Summary of Proposed Reliability Standards: IRO-010-5 and TOP-003-6. 1 - IESO
The proposed revisions to IRO-010-5 and TOP-003-6 1 address recommendations arising from the NERC Standards Efficiency Review Phase 2 Team by clarifying, consolidating, and improving approaches for data and information specification and exchange
- Reliability Standard
Such evidence could include but is not limited to electronic or hard copies of data transmittals or attestations of receiving entities
|
|